Replacing a Shop Front: What Happens, Step by Step

Short answer

Replacing a shop front starts with a survey and design, followed by any planning, listed building or landlord consents. The front is then made to measure, which usually takes a few weeks. On site the old front is removed, the opening made good and the new frame, doors and glass fitted, often in one to three days for a standard unit, with shutters fitted alongside.

Replacing a Shop Front: What Happens, Step by Step

Step one: survey and design

Every shop front is bespoke, so the process starts with a site survey. The surveyor measures the opening, checks the beam or lintel above it, looks at the floor level at the entrance and notes services such as alarm cables, lighting and shutter wiring. They will ask how you use the front: where you want the door, whether you need an accessible level entrance, how important displays are and what security you need after hours.

From this, a design is drawn showing frame layout, door position, glass specification, fascia and any shutter. For conservation areas and listed buildings, the design should reflect local guidance from the outset.

StageTypical timingWho is involved
Survey and design1–2 weeksInstaller, sometimes an architect
ConsentsAround 8 weeks or more if neededCouncil, landlord, freeholder
ManufactureUsually a few weeksFabricator or joinery workshop
Removal and fitting1–3 days for a standard unitInstallation team, glaziers
Shutter and signageOften same weekShutter engineers, sign makers, electrician

Step two: consents and approvals

Most new shop fronts need planning permission, external shutters usually do, and listed buildings need listed building consent. Signage may need advertisement consent. If you rent the unit, your lease will almost certainly require the landlord's written approval for alterations to the frontage, and shopping centres often have their own design rules.

Build these approvals into the timetable before ordering anything. Manufacturing a front before permission is granted risks paying for something the council asks you to change.

  • Planning permission for the new front and any external shutter
  • Listed building consent if the building is listed
  • Advertisement consent for new illuminated or larger signs
  • Landlord or freeholder consent under the lease
  • Building regulations compliance for glazing and access

Step three: manufacture

Once the design and consents are agreed, the front is manufactured. Aluminium fronts are cut and assembled from extruded sections and powder coated in the chosen colour. Timber fronts are made by joiners, with mouldings, pilasters, stall risers and fascias built and primed in the workshop. Glass is ordered to exact sizes, often laminated or toughened for safety, and large panes can take longer to arrive than the frame itself.

Roller shutters are made to measure in parallel, so the box, guides and curtain can be fitted in the same programme rather than added later with fresh disruption.

Step four: removal and fitting

On the fitting day, the area in front of the shop is cordoned off and the old front is taken out. If the job runs over more than a day, the opening is boarded up securely overnight. The fitters check the opening, repair or pack the head and cill where needed, then fix the new frame, hang the door and install the glass. Large panes may need several glaziers or lifting equipment, and work on a busy pavement may need a licence from the highway authority for barriers or scaffolding.

Fixings, sealants and flashings are finished so water runs away from the frame and the joint between the new front and the building is weathertight.

Keeping your business trading

Most owners want to stay open, or close for as short a time as possible. Good planning makes this realistic. Fitting can be scheduled early in the morning, in the evening or over quieter days, and the door can sometimes be fitted first so customers can still get in. Tell customers and neighbours in advance, protect stock near the window from dust, and move displays away from the working area. Ask the installer how long the shop will be boarded and whether out-of-hours work is possible.

If the shop must close, choose your quietest trading day and put a clear notice in the window beforehand. Keeping the old front's glass or door in place until the last moment shortens the time the premises are exposed.

Common surprises once the old front is out

Removing an old shop front sometimes reveals problems that were hidden behind fascias and cladding. Timber beams above the opening may be rotten, steel beams may be corroded, and the brickwork or stonework at the sides may need repair. Old cables for alarms, lighting and signs are often found running through the frame, and some need rerouting before the new front can go in.

Older fascias can also hide original features, such as carved consoles or earlier timber fronts, which may be significant on a listed building or in a conservation area. A good installer will pause, show you what they have found and explain the options and costs before carrying on. Allowing a small contingency in your budget for this kind of discovery avoids difficult decisions on the day.

Step five: handover

At handover, check that doors open and close smoothly, locks work with every key, closers shut the door without slamming and seals are neat. Make sure you have the keys, any shutter remotes, product information and warranty details. If the entrance has been altered for accessibility, check the threshold and door width work for wheelchair users and pushchairs. Ask how to look after the finish, as aluminium and timber need different care, and note any snagging items in writing so they can be resolved promptly.

Questions people also ask

How long does it take to replace a shop front?

On site, a standard single shop front usually takes one to three days to remove and replace, with shutters and signage fitted around the same time. The whole process takes longer, because surveys, consents and manufacture come first. Planning applications commonly take around eight weeks to decide, and manufacture usually takes a few weeks after approval.

Can I stay open while my shop front is replaced?

Often, yes, with careful planning. Installers can phase the work, fit the door first or work outside trading hours, and board the opening securely overnight. Some closure is usually unavoidable while large panes go in, so plan for a quieter day and let customers know in advance.

Do I need my landlord's permission to change the shop front?

Almost certainly. Most commercial leases require the landlord's written consent for alterations to the exterior, and many specify materials, colours or signage. Check the lease before you commission designs, get consent in writing and keep a copy. Shopping centres and retail parks often have additional design rules.

Written and checked by the Shop Fronts and Shutters team. Read our editorial policy.